Greensburg New Water Treatment Plant
Bell Engineering worked with the City of Greensburg to develop a project to replace the existing 1.4 mgd conventional water treatment plant (WTP) with a new 2 mgd conventional WTP. The existing plant had reached the end of its useful life and renovation and expansion were not economically feasible. Also included is the replacement of the existing raw water intake and pumping facility and construction of new high service transmission piping to connect the new water treatment plant to the existing distribution system. Currently under construction, the project spotlight included below highlights the waterproofing admixture used to help protect the walls and slabs throughout the new water treatment plant.
See the Project Spotlight here.